Headworks Corrosion Rehabilitation and Addition of Metering Chamber Mount Albert Water Resource Recovery Facility

Location

5866 Doane Road, Town of East Gwillimbury, ON

Client

The Regional Municipality of York Status: Completed 2020 Consultant: Cole Engineering Group Limited
The Work includes, but is not limited to, Headworks Corrosion Rehabilitation and Addition of a Metering Chamber at the Mount Albert Water Resource Recovery Facility located at 5866 Doane Road in the Town of East Gwillimbury, consisting of the following: .1 Headworks Rehabilitation The existing Headworks is severely corroded due to a high presence of hydrogen sulfide corrosive wastewater gas. The scope of work includes, but is not limited to:  Removal and disposal of temporary aluminum floor plates  Cleaning the existing wastewater channels and vortex grit tanks within the Headworks  Chipping out deteriorated concrete within the wastewater channels and vortex grit tanks  Rebuilding the concrete wall(s) profiles, including reinforcement  Grit blasting and coating of all the channels and tanks with a cementitious corrosion resistant coating  Supply and installation of stainless steel seating angles along the top of all walls and tanks to support the new covers.  Removal and disposal of existing channel slide gates  Supply and installation of new UV-resistant FRP covers on all channels and tanks  Modifications to the existing concrete inlet chamber, includes: new piping, concrete chipping, and concrete fill, and external excavation  Supply and installation of davit bases and life safety anchor points to replace the existing corroded items .2 Headworks Bypass  In order to facilitate the Headworks Rehabilitation a bypass must be installed from the inlet forcemain to the lagoon manhole. The scope of work includes, but is not limited to:  Modification of the “splitter” inlet chamber and piping at plant entrance  Temporary fused HDPE piping from the bypass connection, at the “splitter” inlet chamber, to the existing lagoon manhole  Temporary fused HDPE piping from the existing lagoon manhole to the existing aeration tanks  Bypass pumping system installation, monitoring and removal  Works include excavation, temporary road plates, and roadway repair .3 Metering Chamber  Precast concrete metering chamber  Includes new magnetic flowmeter, installation and calibration  Includes installation of meter complete with power and signal, SCADA signal termination of meter into existing on-site PAC Panel  Includes excavation and roadway repair.  Removal of the existing 350mm diameter magnetic flow meter located in the headworks building, to be cleaned and returned to the Region, and supply and installation of a spool piece.

Primary Sidebar

  • Home
  • About
    • Our Company
    • Our Partners
    • Health & Safety Policy
  • Projects
    • All Projects
    • In Progress
    • Completed
  • Employment
  • Contact

Footer

  • Home
  • Employment
  • Contact
  • Privacy Policy
  • Terms and Conditions
  • About
  • Our Company
  • Our Partners
  • Health & Safety Policy
  • Projects
  • In Progress
  • Completed

Kingdom Construction Limited
3172 Alps Road, RR#1
Ayr, ON
N0B 1E0
519-632-5155
519-632-8855
[email protected]

  • Home
  • About
    • Our Company
    • Our Partners
    • Health & Safety Policy
  • Projects
    • All Projects
    • In Progress
    • Completed
  • Employment
  • Contact