Welland Wastewater Treatment Plant Primary Digester No. 2 Upgrades

Location

505 River Rd., Welland, ON, L3B 5N4

Client

The Regional Municipality of Niagara Status: Completed Consultant: Stantec Contulting Ltd.
- Evaluation services to Digester Building Floor Slab Support Corbal at Digester 2 - Excavation, Backfill and site restoration - Supply and installation of new instrumentation into the digester rooftop including: - New radar type level transmitter - New ultrasonic level transmitter - New conductivity type high level switches (x3) - Two (2) new capacitive type pressure transmitters into the gas dome - Instrumentation installation includes all accessories, cabling, PLC connections and other required items for a functioning system - Staging, testing commissioning, and training of the above works. Including Preliminary Pressure Test and a Final Pressure Test to be witnessed by TSSA - Provisional Items - Concrete Repairs and Coating under CA/Engineer directions

Primary Sidebar

  • Home
  • About
    • Our Company
    • Our Partners
    • Health & Safety Policy
  • Projects
    • All Projects
    • In Progress
    • Completed
  • Employment
  • Contact

Footer

  • Home
  • Employment
  • Contact
  • Privacy Policy
  • Terms and Conditions
  • About
  • Our Company
  • Our Partners
  • Health & Safety Policy
  • Projects
  • In Progress
  • Completed

Kingdom Construction Limited
3172 Alps Road, RR#1
Ayr, ON
N0B 1E0
519-632-5155
519-632-8855
[email protected]

  • Home
  • About
    • Our Company
    • Our Partners
    • Health & Safety Policy
  • Projects
    • All Projects
    • In Progress
    • Completed
  • Employment
  • Contact