Washburn Pump Station and Reservoir Upgrades in the City of Burlington
Location
Burlington, OntarioClient
The Regional Municipality of Halton Status: Substantially Completed Consultant: Associated EngineeringGeneral miscellaneous upgrades to the Washburn Pump Station and Reservoir. Summary of work as follows:
Heating and ventilation upgrades to the Fuel Room. Transformers Area works required to replace electrical ducts with new cable busways; Electrical upgrades; Remote Radiator Room works required to attenuate generator noise; Provide accessibility to currently inaccessible roofs as per contract drawings.; Miscellaneous process upgrades; Repair concrete deficiencies and complete structural upgrades at various locations throughout the facility; Address drainage issues at various locations throughout the facility; Clean and epoxy coat various locations throughout the facility; Upgrade the Gas Chlorination System; Start/Stop Pump Controls Upgrades; Generator Test Upgrades: Fuel Transfer Pump Controls Upgrades; Temporary Generator Connection Upgrades and, Instrumentation and Controls Upgrades.